Decision Criteria for Regulatory Measures on TCAS II Version 7.1

Decision Criteria for Regulatory Measures on TCAS II Version 7.1

Publication info
Author
EUROCONTROL
Category
Safety Nets
Date of publication
17/07/2008

EUROCAE and RTCA have jointly developed revised Minimum Operational Performance Standards (MOPS) for Traffic alert and Collision Avoidance System (TCAS) II published in [ED-143] and [DO-185B] respectively, to be known as TCAS II version 7.1 Fifteen scenarios for the introduction of TCAS II version 7.1 have been investigated in the study involving a range of start and completion dates for the transition phase and various speeds of retrofits, including the “late rush retrofit hypothesis.

SKYbrary Partners:

Safety knowledge contributed by: