Final Report AIFN/0011/2015: B734 (AP-BJR, Sharjah UAE, 24 Sept 2015

Final Report AIFN/0011/2015: B734 (AP-BJR, Sharjah UAE, 24 Sept 2015

Publication info
Author
AAIS (UAE)
Category
Ground Operations Human Factors Air Ground Communication Wrong Runway Use
Date of publication
13/04/2017

On 24 September 2015, a Boeing 737-400 cleared for a night take-off from Sharjah took off from the parallel taxiway. The controller decided that since the taxiway was sterile and the aircraft speed was unknown, the safest option was to allow the take-off to continue. The Investigation noted that the taxiway used had until a year previously been the runway, becoming a parallel taxiway only when a new runway had been opened alongside it. It was noted that the controller had lost visual watch on the aircraft and regained it only once the aircraft was already at speed.

SKYbrary Partners:

Safety knowledge contributed by: